Flag the gaps before the contract
By the end of this lesson you can name the capability gaps of each deployment path and put them in front of the client without losing the deal.
Every gap gets discovered. The only question is by whom, and when
In Lesson 3.1 you recommended a path. The same CLI runs on all of them, but the surface around it differs, and those differences surface mid-activation if you let them.
On a 30-day activation the pattern is predictable:
- Week one: a champion asks where a feature went
- Week two: the CoE asks why the metrics dashboard is empty
- Day 30: the biggest-gaps report either contains items the client has known about since contract time, or items they're hearing for the first time with your name attached
A one-page gap memo, delivered with the path recommendation before signature, is the cheapest insurance in this course. It's the same discipline as flagging scope exclusions in an SOW: nobody disputes a line they agreed to.
A gap flagged at contract time is consulting. The same gap discovered in week three is a defect with your name on it.
Six gaps that belong in your memo
These are the differences between the cloud paths and Enterprise direct that clients actually hit. Match them to the path you recommended in 3.1.
- Allow 24 to 48 hours for Model Garden access approval
- Enable MCP tool search explicitly: off by default, so large tool catalogs load upfront if left unconfigured
- Verify prompt caching by region: availability varies on both Vertex and Bedrock; if cache counts sit at zero, check the region
A gap memo is one page, not a risk register
Structure each line the same way:
- Name the gap: which capability is absent or reduced on this path
- Place the moment: which week, which person, which meeting the client would have hit it
- Lead with the mitigation: the plan already in place, stated before the limitation
"WebSearch is unavailable on Bedrock; your platform docs team would hit this in week one; we'll scope an approved MCP alternative in pre-kickoff" reads as preparation. A bare feature comparison table reads as a reason to stall the deal. Lead with the mitigation, and the memo becomes evidence you've done this before.
Northgate Logistics signed Bedrock. The gaps start arriving
You wrote the gap memo at contract time. Now the activation is live and the gaps surface one by one. Three decisions, six points.
Same rules as Meridian. Click a card to commit. Green is a strong call, orange is defensible, grey costs you the room.